Grazia v South Carolina State Plastering, LLC

Case No. 26882 (SC S.Ct., Oct. 4, 2010)

Anthony and Barbara Grazia appeal the circuit court's grant of a motion to strike class allegations from their complaint. The Grazias contend the circuit court erred in finding the Notice and Opportunity to Cure Construction Dwelling Defect Act is in conflict with the State's class action lawsuit jurisprudence under Rule 23, SCRCP. We agree and reverse.

FACTUAL/PROCEDURAL BACKGROUND



This action involves the alleged negligent and defective construction of residential homes in a subdivision in Bluffton, South Carolina. The Grazias brought a class action on behalf of themselves and those similarly situated, asserting defective exterior stucco work by Respondent South Carolina State Plastering, LLC (State Plastering) in the construction of approximately 2,673 homes in a development called Sun City. The complaint maintains the stucco exteriors had common and typical problems inherent to their design and installation that would require identical remediation across the class, namely, stripping the homes of the existing stucco and recladding with a properly installed stucco system.

State Plaster answered, and brought a third-party complaint against Del Webb Communities, Inc. (Developer), Pulte Homes, Inc. (Builder), and Kephart Architects, Inc. (Architect), (collectively referred to as Respondents). In its answer, State Plaster argued the Grazias had failed to comply with the express provisions of the Notice and Opportunity to Cure Construction Dwelling Defect Act (Right to Cure Act), which entitles a contractor or subcontractor to notice of any qualifying construction defect, and the opportunity to cure, before the action is commenced. At the time this action was filed, the Grazias had not complied with the notice requirements; therefore, the parties entered into a consent order staying the action pending subsequent compliance with the Right to Cure Act. The Grazias then personally complied with the Right to Cure provisions, and the consent order was lifted. Thereafter, Respondents moved to dismiss the class allegations contained in the Grazias' complaint, or, in the alternative, requested a stay of the proceedings until each of the similarly situated plaintiffs complied with the Right to Cure Act notice requirements.

A hearing on Respondents' motions was held, and additional memoranda in support of the parties' respective positions were submitted to the court following the hearing. Ultimately, the circuit court issued an order striking the Grazias' class allegations as incompatible with the Right to Cure Act. The Grazias filed a motion for reconsideration with the circuit court, but it was denied, and this appeal followed. The following issue is presented to the Court on appeal:
 

 

Judge(s): Kaye G. Hearn
Jurisdiction: South Carolina Supreme Court
Related Categories: Construction , Torts
 
Supreme Court Judge(s)
Donald Beatty
Kaye Hearn
John Kittredge
James Moore
Costa Pleicones

 
Trial Court Judge(s)
Doyet Early, III

 
Appellant Lawyer(s) Appellant Law Firm(s)
John Chakeris Chakeris Law Firm
Jefferson Leath, Jr. Leath Bouch & Seekings LLP
Michael Seekings Leath Bouch & Seekings LLP
Phillip Segui Segui Law Firm LLC

 
Appellee Lawyer(s) Appellee Law Firm(s)
Victor Rawl, Jr. McNair Law Firm PA
Robert Widener McNair Law Firm PA
Everett Kendall, II Sweeny Wingate & Barrow PA
Christy Mahon Sweeny Wingate & Barrow PA

 

CUSTOM EMAIL ALERTS!

With your FREE registration, you can select an unlimited number of Alert categories for daily, weekly or monthly deliveries of the Federal and State Cases most relevant
to you!

Click Here to sign up.

 



Click the maroon box above for a formatted PDF of the decision.
sued as representative parties on behalf of all only if the court finds (1) the class is so opportunity to inspect and remedy/settle are substantially abridged when a court stays the b. harmonization of the right to cure act's stay provision and notice requirements intent of the south carolina legislature. i respectfully dissent. homes in a development called sun city. the complaint maintains the stucco exteriors appeal followed. the following issue is presented to the court on appeal: class certification did not meet the statutory mandates of the right to cure act, and that the claims without using litigation, by providing an environment that codifies a the legislature further provided for a stay of an action when a "claimant files an action in court with the express provisions of the notice and opportunity to cure construction dwelling defect of class certification are required to prove. see gardner v. south carolina dep't of revenue, 353 resolves the purported statutory conflict in a manner that i believe is patently at odds with the which indicates whether a stay has been granted for a civil action filed pursuant to the south south carolina state plastering, llc (state plastering) in the construction of approximately seen by exploring the public policy behind the right to cure act, which respondents, themselves, thwarting the act's pre-filing notice mandate. actual exercise of the rights to notice and the opportunity to cure, not when those rights are http://www.judicial.state.sc.us/opinions/htmlfiles/sc/26882.htm consent order was lifted. thereafter, respondents moved to dismiss the class allegations when these prerequisites are met, the court may then find that representative notice under the ("the prerequisites are: 1) the class must be so numerous that joinder of all members is intended to engage in a meaningless act. themselves and those similarly situated, asserting defective exterior stucco work by respondent thousand homes," while the grazias' own motion for reconsideration refers to 2,673 homes. 65, 463 s.e.2d 97 (ct. app. 1995)). "the question is whether in the light most favorable to the carolina dept. of revenue, 331 s.c. 611, 503 s.e.2d 471 (1998)). "a statute should not be shall stay the action until the claimant has complied with the requirements of this article") (developer), pulte homes, inc. (builder), and kephart architects, inc. (architect), (collectively claimant [who] files an action in court before first complying with the requirements of this article . . the contractor or subcontractor shall advise the claimant within fifteen days of receipt meet pre-filing notice requirements is that the court will not recognize the suit as "filed." in my the face of the complaint. id. at 632-33, 494 s.e.2d at 433. "the motion cannot be sustained if actions for refunds of taxes); s.c. code ann. 39-5-140(a) (1985) (preventing an action for actual charleston, phillip ward segui, of segui law firm, of in my view, the consequence of filing a lawsuit before meeting the notice requirements is simply plaintiff, and with every reasonable doubt resolved in her behalf, the complaint states any valid the circuit court made no such finding, nor is it the "effect" of the circuit court's ruling. the circuit http://www.judicial.state.sc.us/opinions/htmlfiles/sc/26882.htm pertinent provisions of the legislation are as follows: consequently, the circuit court erred in striking the grazia's class allegations on the basis that the motion to dismiss a claim, this court must base its decision solely on the allegations set forth on defenses of the representative parties must be typical of the claims or defenses of the class; 4) the (a) in an action brought against a contractor or subcontractor arising out of the littlefield v. south carolina forestry comm'n, 337 s.c. 348, 354-55, 523 s.e.2d 781, 784 (1999). act (right to cure act),[2] v. jasper county, 368 s.c. 388, 398, 629 s.e.2d 624, 629 (2006) (citing tns mills, inc. v. south the act mandates that a claimant "must" serve a residential home builder with notice of a claim support this position. moreover, policy reasons militate against an interpretation that not only consequence of failing to do so. the circuit court would hold that the consequence of failing to statute appear on their face to be conflicting, every effort should be made to reconcile these http://www.judicial.state.sc.us/opinions/htmlfiles/sc/26882.htm 40-59-840. notice of claim; timing; contents; request for clarification. consistent with those accorded to any defendant in litigation, and are "rights" already available to the act specifies that within "thirty days from service of the notice," the contractor or subcontractor situations. the plain language of section 40-59-830 does not restrict its application beyond "[a] was designed as an exception to the usual rule that litigation is conducted by and on behalf of the fashion under rule 23." califano, 442 u.s. at 701, 99 s.ct. at 2557. this court has expressed analyzing whether or not the right to cure act is in conflict with rule 23. ex parte chase, 62 s.c. proceedings under section 40-59-830, thereby granting the contractor/subcontractor the ability to it is clear to this court that these two provisions are at odds, as the language used in section finally, the circuit court determined that the right to cure act and the procedures for certifying a (a) in an action brought against a contractor or subcontractor arising out of the const., art. v, 4 (2009) ("subject to the statutory law, the supreme court shall make rules proper, much less the manner in which it would be achieved and managed, is not an issue that is endorses a more expansive view of class action availability than its federal counterpart. question. mahon, both of sweeny wingate & barrow, pa, all of explore those rights in full. as a result, we believe once properly harmonized, the right to cure and rule 23. "[t]he class-action device saves the resources of both the courts and the parties by the circuit court also erroneously found, based on an argument advanced by respondents, that thereafter filed lawsuits, without complying with the notice requirements, the party who failed to circuit court to determine whether or not the action meets each of the five prerequisites proponents amount in controversy must exceed one hundred dollars for each member of the class."). if and under section 40-59-840 should trump the general assembly's equally plain intent to allow actions action, serve a written notice of claim on the contractor. the notice of claim must second, the majority opinion suggests that "[t]he effect of the circuit court's determination was that [3] the alleged rights include: (1) the right to request clarification of the alleged defect ( amount in controversy exceeds one hundred dollars for each member of the class. http://www.judicial.state.sc.us/opinions/htmlfiles/sc/26882.htm section 40-59-840, but that is not the issue before us. the precise question before the circuit court app. 1995) (considering similar notice provisions included in statutes requiring pre-litigation notice right to cure act is appropriate. just as respondents maintain the general assembly's failure to [7] it appears from the record that the circuit court did not rule on the remainder of respondents' acting chief justice pleicones: because i disagree with the reasoning of the circuit related to an alleged defect in the construction of a dwelling no later than ninety days "before 6 of 11 9/9/2011 1:30 pm generalized argument against class action litigation, as the named plaintiff in a class action will referred to as respondents). in its answer, state plaster argued the grazias had failed to comply 40-59-850); (4) the right to offer to settle the claims ( 40-59-850); and (5) the right to deny the advocate ignoring the equally plain language of the stay provision contained in section 40-59-830. must notify the claimant of his "election under this section." 40-59-850(a).[8] "failure to statutory rights. (emphasis in majority opinion). i believe the issue of "when" notice is given was rule must be resolved in favor of the statute. the effect of the circuit court's determination was opinion, this position cannot be correct given 40-59-830, which (1) explicitly recognizes a doyet a. early, iii, circuit court judge 40-59-830. stay of action upon non-compliance with article. (b) the claimant shall serve a response to the contractor's offer, if any, within ten days s.c. 1, 20-21, 577 s.e.2d 190, 200 (2003) (quoting rule 23, scrcp) (internal quotations omitted) these rights under the right to cure act notice provisions are not new substantive rights, but alternative dispute resolution method to promote settlement of construction disputes without carolina notice and opportunity to cure construction defects act." 40-59-860(b). bar class action litigation in other areas. see s.c. code ann. 9-21-40 (supp. 2009) (prohibiting that no class action lawsuits could be filed for claims falling under the rubric of the right to cure the act renders the statutory requirement for pre-filing notice meaningless. damages from being brought in a representative capacity). i. did the circuit court commit reversible error in granting respondents' motion to strike class as applicable, election under this section. the claimant shall allow inspection of the i do agree with the proposition posed by the majority that, as a general rule, the act's stay an action [] before first complying with [ 40-59-840], on a motion of a party to the action, the court of rule 23, south carolina rules of civil procedure (scrcp) intentionally omitted from state v. squires, 311 s.c. 11, 14, 426 s.e.2d 738, 739 (1992). "in construing statutory language, http://www.judicial.state.sc.us/opinions/htmlfiles/sc/26882.htm 2,673[1] governing the practice and procedure in all such courts."). however, in construing these two an action, while section 40-59-830 provides a contractor/subcontractor with a means of staying an "when"), then the act's stated pre-filing notice requirement serves no purpose and the legislature standard of review 11 of 11 9/9/2011 1:30 pm instead represent an effort by the general assembly to provide the contractors/subcontractors a and avoid potential statute of limitations concerns. i part company with the majority's construction, i. right to cure act incompatible with rule 23, scrcp a case on a ground not before it."); see also booth v. grissom, 265 s.c. 190, 192, 217 s.e.2d 223, the notice requirements before filing a lawsuit. however, i differ with the circuit court as to the provisions within the right to cure act. dictates a different result. consequently, the circuit court erred in construing section 40-59-830 in access to the dwelling for inspection and if repairs have been agreed to by the parties, 8 of 11 9/9/2011 1:30 pm county of newberry, 379 s.c. 564, 572, 666 s.e.2d 892, 896 (2008) (quoting feldman v. s.c. tax which reads the stay provision as an invitation to willfully ignore the pre-filing notice requirement. court's analysis regarding the right to cure act's notice provisions; however, in light of this court's permitting an issue potentially affecting every class member] to be litigated in an economical the same basic precepts of statutory construction, namely harmonization. individual named parties only). upon a motion for class certification, it will be incumbent on the mt. pleasant, w. jefferson leath, jr., and michael s. inspect the dwelling ( 40-59-850); (3) the right to offer to remedy the alleged defect ( typical of the claims or defenses of the class, (4) the representative parties will fairly motion of a party to the action, the court shall stay the action until the claimant has complied with on respondents' motion to strike class allegations, the number was referenced as "some four not a class action is feasible under the circumstances in each individual case, rather than striking statutory construction allow us to hold otherwise.[9] and 56 v. cox, 308 s.c. 171, 417 s.e.2d 560 (1992)); but see ramsey v. county of mccormick, south carolina state plastering, llc, respondent, 306 s.c. 393, 397, 412 s.e.2d 408, 410 (1991) (citing jolly v. atlantic greyhound corp., 207 s.c. fact common to the class, (3) the claims or defenses of the representative parties are issued an order striking the grazias' class allegations as incompatible with the right to cure act. seekings, of leath, bouch & crawford, llp, both of contain the following: 7 of 11 9/9/2011 1:30 pm pre-filing notice requirements of section 40-59-840 by adding unidentified claimants to the pending goudeau, 279 s.c. 561, 562, 309 s.e.2d 758, 759 (1983) ("it is an error of law for a court to decide rule 23 is a court rule, an attempt to harmonize the two would run counter to the general rule that [5] as will be discussed below, the question of whether certification of a class in this case is for these reasons, i disagree with the circuit court's decision to strike the class action allegations respond within thirty days is deemed a denial of the claim." id. "if the parties cannot settle the them under existing discovery and production requirements of rule 34(a)(2), scrcp, once a had common and typical problems inherent to their design and installation that would require homes, inc., are respondents. beatty, j., and acting justice james e. moore, concur. acting chief justice columbia, for respondents. to be stayed pending compliance with the right to cure act. the folly of this argument can be kephart architects, inc., third-party defendants, (1) a statement that the claimant asserts a construction defect; and adequately protect the interests of the class, and (5) in cases in which the relief properly before the court. consequently, the issue is not whether these claims could be properly if the claimant files an action in court before first complying with the requirements of this article, on and (a) the contractor or subcontractor has thirty days from service of the notice to inspect, of claim on the contractor) (emphasis added) and 40-59-830 (providing that "[i]f a claimant files complaint, is in the nature of a motion to dismiss under rule 12(b)(6), scrcp. mccormick v. 5 of 11 9/9/2011 1:30 pm a hearing on respondents' motions was held, and additional memoranda in support of the parties' the grazias contend the circuit court committed reversible error in striking the class allegations situation where a party has filed a lawsuit before satisfying the notice requirements and (2) permits when an action containing class allegations is filed under the act.[5] however, 'is purely an arbitrary rule of construction and is to be resorted to only when there is the basis for our decision is once again rooted in the public policy behind the right to cure act's act 82 (s.b. 433). the stated public policy, therefore, is not abridged when a court, on motion, is right to cure act does not provide for representative compliance with its notice provisions; from its complaint based on its conclusion that class action lawsuits under rule 23, scrcp, are law firm, pa, everett a. kendall, ii and christy e. right to deny the claim ( 40-59-850). provided by contract or by law." 40-59-850(c). mandatory plain language of the notice requirements in sections 40-59-840 and 850, respondents filing of lawsuits that qualify under the right to cure act. subsection 840, as provided above, [4] rule 23 provides: alleged defect ( 40-59-850); (4) the right to offer to settle the claims ( 40-59-850); and (5) the litigation, while adequately protecting the rights of homeowners; and (2) requiring a would-be entered into a consent order staying the action pending subsequent compliance with the right to the circuit court also found that section 40-59-840 imposes an absolute condition precedent to the s.c. code ann. 40-59-840 (emphasis added). plaintiff will prevail in the action." id. at 633, 494 s.e.2d at 433-34. the right to cure act endowed substantive rights[3] on the contractor/subcontractor, through the concerned about "when" a contractor or subcontractor actually received notice and exercised its never have specific standing for each individualized claim that comprises the class. see califano admissible in an action. staying of an action, upon motion by any party to the action, applied only to those persons who 273-74, 692 s.e.2d 516, 519 (2010) (citation omitted). simply stated, there is no statutory or case [2] s.c. code ann. 40-59-810 et seq. (supp. 2009). denial of the claim. apparently conflicting provisions, and bring them into harmony, if possible). representative parties must fairly and adequately protect the interests of the class; and 5) the bring claims without first meeting the pre-filing requirements of 40-59-840, though such claims the requirements of this article. impracticable; 2) there must be questions of law or fact common to the class; 3) the claims or provision should be invoked when an action is filed in violation of the notice requirements of 1, 35 s.e.2d 42 (1945)) ("under the 'last legislative expression' rule, where conflicting provisions 3 of 11 9/9/2011 1:30 pm filing the action:" law must be construed together and each one given effect." south carolina state ports authority certified, but rather whether class certification could be achieved under any circumstances under and us is whether the legislature intended to grant a court the authority to preemptively sanction compliance. contained in the grazias' complaint, or, in the alternative, requested a stay of the proceedings until the language included in section 40-59-840 requires potential claimants to submit notice to a pre-filing notice is not satisfied. so construed, the stay operates as a failsafe to preserve an action anthony and barbara grazia, individually and on incompatible with the right to cure act. we agree. plaintiff in certain construction defect matters to file a notice of claim with the would-be defendant act in a manner that gives each provision its due effect. of the right to cure act: the predominant concern should be on the contractor/subcontractor's reverse the order of the circuit court. i express no opinion as to whether a class action is respondents maintain that individual claimants under the right to cure act are the sole persons each of the similarly situated plaintiffs complied with the right to cure act notice requirements. filing situations. upon concluding this, the circuit court did not thereafter attempt to harmonize the this court's primary consideration in interpreting a statute is finding the intent of the legislature. john t. chakeris, of chakeris law firm, of opinion no. 26882 opinions."); in re chance, 277 s.c. 161, 161, 284 s.e.2d 231, 231 (1981) (noting south carolina appeal from beaufort county majority opinion). if the legislature was not concerned about the timing issue (the question of (c) if the parties cannot settle the dispute pursuant to this article, the claimant may two provisions. we believe it is possible to construe these two provisions under the right to cure applicable law and the other party does not. under the circuit court's rule, if both parties serve written notice no later than ninety days before filing the action. we find no error in the circuit del webb communities, inc., pulte homes, inc. and justice hearn: anthony and barbara grazia appeal the circuit court's grant of a motion to http://www.judicial.state.sc.us/opinions/htmlfiles/sc/26882.htm seemingly conflicting portions of the same act, the circuit court does not appear to have utilized suggest should control. use a class action to avoid the requirements of the act on behalf of the putative class members." i precedent to filing an action, in the absence of a mistaken filing. as we determined above, the pleicones, concurring in a separate opinion. kittredge, j., dissenting in a separate class action under rule 23[4] without using litigation, by providing an environment that codifies a contractor/subcontractor's shall stay the action until the claimant has complied with the requirements of this article."). i 10 of 11 9/9/2011 1:30 pm class action lawsuit jurisprudence under rule 23, scrcp. we agree and reverse. contractor/subcontractor's ability to inspect and offer a remedy or settlement." i believe the allegations? normal civil action is filed. rule 34(a)(2) provides: clearly mandated pre-litigation efforts to resolve construction defect claims. the majority required to stay a proceeding in order to require compliance with the right to cure act's notice 2 of 11 9/9/2011 1:30 pm excuses, but encourages ignorance of the law and leads to incongruous results. for example, the right to cure act has an express public policy intent of: (1) addressing the need for an we find no fatal conflict between the right to cure act and this state's class action jurisprudence, 9 of 11 9/9/2011 1:30 pm 40-59-840 that the claimant "must" serve written notice on a contractor or subcontractor "before http://www.judicial.state.sc.us/opinions/htmlfiles/sc/26882.htm [9] as a further expression of legislative intent to ensure the parties' compliance with the act, the claims prosecuted on behalf of a class); s.c. code ann. 12-60-80(c) (supp. 2009) (barring class disagree with the circuit's court premise, as i believe putative class members could individually court order forecloses only appellants' attempt to create a class action lawsuit by purposely action under the notice provisions of sections 40-59-840 and 850, as opposed to during an action's i make two final points. first, i disagree with the court's finding that the legislature was not the statutory preference for the section 40-59-840 pre-filing notice requirement. the legislature legislature directed court administration to develop a designation on the civil action cover sheet rule 23 are incompatible was its view that the section 40-59-830 stay provision cannot be used to numerous that joinder of all members is impracticable, (2) there are questions of law or the court is called upon to construe the act. s.c. code ann. 40-59-810 to 860 (supp. 2009). this action involves the alleged negligent and defective construction of residential homes in a compatible with the act.[7] designated land or other property in the possession or control of the party upon whom any relief on any theory of the case." id. at 633, 494 s.e.2d at 433 (citing dye v. gainey, 320 s.c. 40-59-840); the right to inspect the dwelling ( 40-59-850); (3) the right to offer to remedy the v. yamasaki, 442 u.s. 682, 700-01, 99 s.ct. 2545, 2557 (1979) (providing that class-action device of the claim if the construction defect is not sufficiently stated and shall request claim for relief. the cause of action should not be struck merely because the court doubts the 224 (1975) ("it is elementary that the courts of this state have no jurisdiction to issue advisory and rule 23 are incompatible. the circuit court found section 40-59-830, which allows for the (emphasis added). the circuit court found the right to cure act, as a whole, incompatible with "this court should give words their plain and ordinary meaning, without resort to subtle or forced v. construction of a dwelling, the claimant must, no later than ninety days before filing the identical remediation across the class, namely, stripping the homes of the existing stucco and action was filed, the grazias had not complied with the notice requirements; therefore, the parties claim ( 40-59-850). the majority refers to these statutory provisions as "alleged rights." claimant is not required to accept any offer by the contractor/subcontractor to remedy the alleged [6] we also note that, to the extent the circuit court's order found that a purported proposal for the contractor or subcontractor shall advise the claimant within fifteen days of receipt law basis for the circuit court's holding that section 40-59-830 should only apply in accidental claimants file an action prior to full compliance with the notice provisions. as discussed above, the 40-59-850. contractor's election to inspect, remedy, settle, or deny claim; a. section 40-59-830 stay provision http://www.judicial.state.sc.us/opinions/htmlfiles/sc/26882.htm 353, 362-63, 38 s.e. 718, 724 (1901) (discussing the well-settled rule that where two portions of a defects. the claimant shall receive written notice of the contractor's or subcontractor's, onto and inspection of the claimant's dwelling is now permitted to occur prior to the filing of the the parameters of the act's public policy. contractor/subcontractor prior to filing a qualifying action. conversely, the general assembly also normal discovery period. as the grazias correctly point out, the right to cure act does not confer nothing to restrict the furtherance of that purpose; instead, the purpose is better served by the right to cure act is set forth in sections 40-59-810 to 860 of the south carolina code. the in dissenting, i would join the trial court in refusing to permit appellants to willfully violate the act's stay and notice provisions may be construed together to give each one its due effect, within ability to inspect and offer a remedy or settlement. enforcing a stay provision does absolutely factual/procedural background rights in normal discovery, as does "any defendant in litigation," misses the mark. (emphasis in new procedural timeline for asserting existing litigation rights. in other words, the right of entry . ." there is nothing in the wording of section 40-59-830 which supports the circuit court's court's interpretation of the act encourages a claimant to intentionally ignore the pre-filing notice filing the action." the argument that a contractor or subcontractor may rely on these statutory straightforward and unambiguous statutory scheme. having created a phantom conflict in the familiarize himself with the applicable law is not barred by the statute of limitations while the party clearly an irreconcilable conflict, and all other means of interpretation have been exhausted.' "). of receipt of the offer. a. victor rawl, jr., and robert l. widener, of mcnair limitation of this provision to mistaken filing situations; rather, the plain language of the statute reasonable access to affect repairs. failure to respond within thirty days is deemed a 40-59-840 appears to require mandatory compliance with the act's notice provisions prior to filing acknowledges as much--"the purpose of the act is to encourage the resolution of these types of of whom del webb communities, inc. and pulte strike class allegations from their complaint. the grazias contend the circuit court erred in finding determine the general nature of the construction defect; and heard june 23, 2010 filed october 4, 2010 allowing the use of the right to cure act's stay provision to allow a court to determine whether or dispute pursuant to this article, the claimant may proceed with a civil action or other remedy c. incompatibility with rule 23, scrcp the legislature expressed a preference for the pre-filing notice, and i do not believe our rules of right to cure act is incompatible with rule 23.[6] (d) any offers of settlement, repair, or remedy pursuant to this section, are not notice and opportunity to cure construction dwelling defects act (act) remains an open the notice and opportunity to cure construction dwelling defect act is in conflict with the state's encompasses civil lawsuits filed against a contractor or subcontractor, and requires the claimant to respondents thus argue that their pre-litigation receipt of notice and the act's accompanying state. the underlying basis for the circuit court's determination that the right to cure act and state plaster answered, and brought a third-party complaint against del webb communities, inc. "rights," should be the court's prevailing concern. we believe this is contrary to the public policy south carolina notice and opportunity to cure construction dwelling defects act (act), the court construed by concentrating on an isolated phrase." id. (citing laurens county school districts 55 recladding with a properly installed stucco system. the practice of willfully violating the pre-filing notice requirements of the act. i am convinced, as any corresponding obligations on the part of the claimant that would not ordinarily be present: the may be stayed pending compliance. and concluding that the purpose of a statute is better served by abeyance than dismissal). which entitles a contractor or subcontractor to notice of any qualifying behalf of all other similarly situated plaintiffs, any party may serve on any other party a request . . . (2) to permit entry upon (stating "[a] claimant must, no later than ninety days before filing the action, serve a written notice section. the claimant shall give the contractor and any subcontractors reasonable action, serve a written notice of claim on the contractor. the notice of claim must (2) a description of the claim or claims in reasonable detail sufficient to due to the putative class members' failure to comply with the notice provisions. i would therefore requirements and is in direct conflict with legislative intent. i believe the court's interpretation of appellate courts have "consistently refrained" from issuing purely advisory opinions). proceed with a civil action or other remedy provided by contract or by law. specifically authorize representative actions under the right to cure act is persuasive, the general bring the claims made in the complaint. consequently, the circuit court granted the respondents' a manner contrary to the plain language of the statute. reversed of civil procedure (frcp). by omitting the additional requirements, rule 23, scrcp, into compliance. with this construction, 40-59-840 and 40-59-830 can be harmonized. determine the general nature of the construction defect; and construction to limit or expand the statute's operation." ward v. west oil co., inc., 387 s.c. 268, the section 40-59-830 stay provision should not be construed to trump or sanction a violation of in the supreme court subdivision in bluffton, south carolina. the grazias brought a class action on behalf of received. as discussed extensively above, we fail to discern how the rights to a pre-litigation v. capital cash, 310 s.c. 288, 294, 423 s.e.2d 143, 147 (ct. app. 1992) (citing friedberg v. would construe the stay provision in section 40-59-830 as applying only when the required proposed process for certification would necessarily require an opt-in procedure violating this england, 328 s.c. 627, 632, 494 s.e.2d 431, 433 (ct. app. 1997). in reviewing a ruling on a assembly's silence in that regard is equally persuasive, especially when it has chosen to expressly under respondents' theory of this case, a contractor/subcontractor's receipt of pre-litigation notice justice kittredge: i vote to affirm the order of the circuit court. the court misconstrues a before first complying with the requirements of this article." s.c. code 40-59-830. ("[t]he court authorized to bring an action for their own homes. stated differently, respondents allege the the class allegations in toto at the outset. see, e.g., trimble v. itz, 898 s.w.2d 370, 373-74 (tex. [1] the number of homes affected by the alleged defective stucco is uncertain. during the hearing respective positions were submitted to the court following the hearing. ultimately, the circuit court contained in the right to cure act, as it formed the basis for the court's determination that the act http://www.judicial.state.sc.us/opinions/htmlfiles/sc/26882.htm holding with respect to the stay provision, it is necessary to harmonize these seemingly inapposite and further find the stay provision would be a reasonable and logical way for a court to proceed instead, it is our duty to attempt to harmonize these two ostensibly at-odd provisions before the state of south carolina contain the following: finally, public policy arguments favor the court finding a way to reconcile the right to cure act charleston, for appellants. commission, 203 s.c. 49, 54, 26 s.e.2d 22, 24 (1943)) ("the last legislative expression rule, the decision of the circuit court is therefore included a stay provision in the right to cure act to specifically address situations where harmonized in a way that furthers the policy of the right to cure act. once properly harmonized, offer to remedy, offer to settle with the claimant, or deny the claim regarding the the right to cure act. notice provisions: the purpose of the act is to encourage the resolution of these types of claims in arguing that this court should not, and more strongly cannot, overcome the seemingly v. court erred in discussing the manner and mode in which the action could be certified. see griffin action that is filed without first complying with the same notice provision. compare 40-59-840 mistakenly file the action prior to complying with the right to cure act, and could not be used to sanction a knowing violation of the statute. we disagree. of the claim if the construction defect is not sufficiently stated and shall request knowingly violate the act's notice provisions, which the court viewed as an absolute condition i do not disagree with the circuit court that s.c. code ann. 40-59-840 requires a plaintiff to meet (1) a statement that the claimant asserts a construction defect; motion, specifically that part of the motion requesting a stay pursuant to 40-59-830. defect, and he or she is not required to accept an offer of settlement of the claim. [8] the act grants certain rights to a contractor and subcontractor upon receipt of the pre-filing the facts alleged and the inferences reasonably deducible therefrom would entitle the plaintiff to motion to strike class allegations from the complaint, reasoning that "[t]he named-plaintiffs cannot therefore, the act is incompatible with class action litigation. however, this is nothing more than a circuit court's analysis of the stay provision was erroneous, and these two provisions may be rule 23. in so doing, the court emphasized that, because the right to cure act is a statute, and (a) prerequisites to a class action. one or more members of a class may sue or be the viewpoint that class actions are favored in this state: was the circuit court, that the legislature intended no such result. provisions. important to the legislature. i believe the legislature expressed a clear preference in section were incompatible, and that any conflict between the statute and the mistakenly filed the action before complying with the act. i can find nothing in the statute to photographing, testing, or sampling the property or any designated object or operation (3) a description of any results of the defect, if known. action. who diligently inquired into the law is barred. such cannot be the intent of the general assembly. inspection of construction defect; response to contractor's offer; admissibility. construction of a dwelling, the claimant must, no later than ninety days before filing the 1 of 11 9/9/2011 1:30 pm our state rule the additional requirements found in federal rule 23(b), federal rules notice provisions, that are inconsistent with class action litigation. however, these "new rights" are cure act. the grazias then personally complied with the right to cure provisions, and the our state class action rule differs significantly from its federal counterpart. the drafters thereon, within the scope of rule 26(b). south carolina state plastering, llc, respondent, opinion construction defect at an agreeable time to both parties, if requested under this clarification. homeowner to meet notice requirements before filing a lawsuit. the circuit court held that absent assume two parties are within 80 days of the statute of limitations. one party researches the the circuit court noted that the mandatory language of s.c. code ann. 40-59-840 requires a the interplay between the right to cure act and rule 23 is an issue of first impression in this this court can no more disregard the stay provision than it can disregard the notice requirements. no class action lawsuits could be filed for claims falling under the rubric of the right to cure act." http://www.judicial.state.sc.us/opinions/htmlfiles/sc/26882.htm circuit court erroneously found that the section 40-59-830 stay provision only applied to accidental clarification. the court to allow the case to proceed unless a party makes a motion to stay the case, pending the statute must be read as a whole and sections which are a part of the same general statutory reversed. and provide an opportunity to resolve the claim without litigation. see 2003 south carolina laws any conflict between a statute and court rule must be resolved in favor of the statute. see s.c. (2) a description of the claim or claims in reasonable detail sufficient to compliance with the pre-filing notice requirements, putative class members could not individually court's prohibition of the procedure as set forth in salmonsen v. cgd, incorporated, the order is a motion to strike under rule 12(f), scrcp, which challenges a theory of recovery in the that, upon the motion of a party, the plaintiff may not proceed with the lawsuit without first coming act. we disagree that the act and class action litigation are incompatible. 4 of 11 9/9/2011 1:30 pm primarily sought is not injunctive or declaratory with respect to the class as a whole, the appellants, to strike class allegations. a motion to certify this class has not been made; therefore, the circuit construction defect, and the opportunity to cure, before the action is commenced. at the time this vacated. 377 s.c. 442, 661 s.e.2d 81 (2008). this case was before the circuit court on a motion it is first necessary to address the circuit court's holding with respect to the stay provision law/analysis consequently, under my view, the court may consider this part of the motion on remand. the request is served for the purpose of inspection and measuring, surveying, the grazias filed a motion for reconsideration with the circuit court, but it was denied, and this http://www.judicial.state.sc.us/opinions/htmlfiles/sc/26882.htm exists, the last in point of time or order of arrangement, prevails."); eagle container co., llc v. (3) a description of any results of the defect, if known. court, i concur in the majority opinion. in my view, whether a class action is compatible with the notice: (1) the right to request clarification of the alleged defect ( 40-59-840); (2) the right to i disagree with the circuit court's view that 40-59-830 applies only to those persons who


All Content © 2007-2012 The Judicial View, L.L.C. All Right Reserved.
About The Judicial View ®  | Privacy Policy   |  Terms of Use   |  Contact Us  |  Advertise